Millmerran Power Station

We supplied the craneage and labour to remove the submerged fly ash conveyors weighing over 200 tonnes from Unit One and Unit 2 at Millmerran Power Station and replace with complete new systems including new conveyors and silos. This involved 20 and 25 tonne franna’s, 35, 50 and 100 tonne slew cranes, riggers, truck and 3 x 8 float and 6 fitters working 12 hour day and night shifts.

Mort Street Malt Factory

We supplied cranes, floats and escorts to remove, transport and unload 8 of 40 tonne x 16m long x 4m diameter vessels from the Mort St Malt factory in Toowoomba. We used 3 x 25 tonne Franna cranes (two with superlifters) and 50 and 50 and 100 tonne cranes working inside the shed to remove vessels from plints and move out of the shed for loading, then transported to Charlton and unloaded.

Toowoomba Range Warrego Highway

We supplied cranes and transport on the Toowoomba Range Warrego Highway re-alignment to lift, transport and place concrete barriers predominantly on nightshift with 2 x 25 tonne Franna cranes and semi trailers. We also supplied side tippers on night shift for the removal of overburden.